About a third of our factory hours go to offices, clinics, cafés and shops. Commercial work runs on deadlines and after-hours access — we plan both into the quote, not around them.

Curved ash reception counter with backlit signage wall in a corporate lobby

Reception Counters

The counter is your handshake. We build around the workflow behind it — parcel shelf, PC bay, cable spine, a lowered accessible section — and the branding in front of it: backlit logos, fluted timber, stone-look cladding.

Most counters go from confirmed drawing to installed in three to four weeks.

Quote My Reception

Conference & Meeting Tables

A boardroom table has to clear the door, seat the headcount and hide the wiring. We template the room, split long tops into invisible joins for the lift, and fit flip-up power modules where laptops actually sit.

Live-edge solid slabs for statement rooms, hard-wearing compact laminate for the rooms that get used daily.

Size My Boardroom Table
Live-edge timber conference table with black steel legs in a boardroom
Upholstered cafe banquette seating with oak frame along a brick wall

Café Banquettes, Panelling & Retail

Banquette seating that squeezes two more covers out of the same floor area. Slat-wall panelling that hides the DB box. Display plinths and shelving that put the product at eye level. We build for the trades that cannot close for renovation — installation happens overnight or on your rest day.

Commercial-grade finishes throughout: 0.8 mm high-pressure laminate, contract upholstery fabrics, concealed fixings.

Plan My Fit-Out
3–4weeks, drawing to install
Nightinstalls for trading premises
1contact from quote to handover
GSTcompliant invoicing for claims

Fit-Out Deadline Approaching?

Send the floor plan and your opening date. We will tell you within a day whether the timeline is realistic — and hold it if we take the job.